他揉捏她两乳不停呻吟a片,亚洲国产成人精品无码区99,无码jk粉嫩小泬在线观看欧美,黑人上司粗大拔不出来电影

Online Service
Scan it
Support hotline
18681482740
Service Hotline:
18681482740
中文  |   English
Industry knowledge
Contact

Address: Floor 1, Building 2, Quanshengchang Industrial Park, Buyong Shajing Road, Shajing Street, Shenzhen

Contact: Mr. Li 18681482740

Email: lilinhan1314@126.com

Website: m.kotuajans.com

Industry knowledge
Assembly of upper mold seat for precision stamping molds
07-19 / 2024

In order to shorten the processing cycle of stamping molds, enhance mold accuracy, unify the methods of operators, reduce anomalies that may occur during mold production, ensure production quality and mold life, the following explanation is given to the assembly process of the upper mold seat of the stamping mold.




The assembly of the upper die seat of the stamping mold is completed in the following 10 steps:




1. Splint Φ 12.000 positioning holes and auxiliary guide pillar holes, with a circumferential chamfer of R1.0 and polished




2. Use a 600 # oilstone or diamond file to remove burrs from the frame opening.




3. Use 600 #~1000 # oilstones to flatten both sides of the template and remove any burrs.




4. Use kerosene and alcohol to clean the mold surface and inner holes.




5. Install the auxiliary guide set into the same template.




6. Place the clamping part of the punch into the template frame and check if the punch is smoothly removed and placed. (Do not put the punch in after it is closed to avoid accidentally breaking the small punch)




7. Fix the punch with a pressure plate. (Note that the pressure plate should not be too close to the punch to avoid interference with the punch.) After fixing the punch, there should be a small amount of movement space to facilitate the natural alignment of the punch.




8. Gently close the detachment plate and the detachment back plate together into the clamp plate, and check if there is any interference in the positioning of the detachment back plate's pressing plate. When fully closed, there should be no gap between the detachment back plate and the clamp plate.




9. After joining, the cutting punch should exceed the pressing surface by more than 0.8mm (minus material thickness).




10. Insert the adjustment rod and upper mold adjustment punch, and rotate the screw until the adjustment punch approaches the effective height.






Through the above 10 steps, the assembly of the upper mold seat of the stamping mold has been completed.






Licao Precision is an ODM/OEM professional manufacturer specializing in the design and manufacturing of precision stamping molds and precision hardware stamping.


Links:Zibo CNC machine tool automatic car washing machine Qingdao refrigeration equipment grinder equipment steel grit fire inspection cabinet sweeper motor desulfurization denitrification equipment drawing mold washing machine automatic soldering machine server repair HART475 hand operator dust-free cloth dust-free paper stack screw type Sludge dehydration machine, precision repair welding machine, Shandong motor repair, rotary hot pot equipment, integrated ultrasonic cleaning machine, Zhongjie radial drilling machine, beer equipment, Shenzhen brass manufacturer, welcome lamp, lens digging, drilling rig, aluminum housing manufacturer, automatic dispensing machine, automatic screwing machine neodymium Iron boron magnet 4g router wireless bridge
We provide you with high quality products
久久精品国产99国产精品导航| 色欲色香天天天综合www| 女人被狂躁免费看30分钟| 国产精品成人一区二区三区无码| 天天躁日日躁狠狠躁| 掀开奶罩边躁狠狠躁学生| 女人被添荫蒂舒服极了| 书生屁股被cao成sao货男男| 国产精品久久久久精品| 6分钟人性短片视频| 青柠在线影院观看日本| 狠狠躁日日躁夜夜躁2022麻豆| 高清视频在线观看| 女同学浮乱系列合集| 成人无遮挡18禁免费视频| 国产精品99久久久久久人四虎| 中文字幕av| 小sb是不是欠c流了那么多| 富婆性俱乐部纵欲狂| 精品国产一区二区三区四区vr| 美女裸体啪啪到高潮无遮挡| 重口老太大和小伙乱| 久久人妻熟女中文字幕av蜜芽| 日久精品不卡一区二区| 高辣慎入hh出轨| 蜜桃传媒一区二区亚洲av婷婷| 在野外自慰和陌生人做了| 亚洲色熟女图激情另类图区| 女人与公驹交酡全过程| 孕妇高潮xxxxx孕妇| 一次灌浆与二次灌浆| 顶楼的大象电影| 少妇被粗大的猛烈进出免费视频| 婷婷五月色丁香综缴情| 人妻少妇偷人精品无码洋洋av| 欧洲美女与动交zoz0z| 他跨越山海而来| 特级毛片www免费版| 网禁拗女在稀缺视频网站| 掉入男人世界的女人阅读| 一出一进一爽一粗一大视频|